This project consisted of the construction of a 100,352 square foot two story middle school. The project involved the removal of the existing tennis courts, driveway, trees and modular classroom. The construction is footings, slab on grade, concrete plank, gypcrete over plank, exterior and interior masonry walls, glazed block, glass block, manufactured stone, shingle roofing, PVC sheet roofing, aluminum windows, aluminum storefronts, drywall partitions, acoustical ceilings, metal ceilings, interior skylight system, ceramic tile, linoleum flooring, vct, carpet, painting, exterior clock, elevator, water system, storm management system, sanitary system, and asphalt paving.

Project: New Pine Hill Middle School
Location: Pine Hill, New Jersey
Owner: Pine Hill Board of Education
Architectural Firm: Kanalstein Danton Associates
Project Architect: Mr. James Davis
Project Manager: Mr. Gerry Pons
Completion Date: 7/01

 
       
Copyright © 2003 Sambe Construction Company, Inc.; all rights reserved. Site by .