Construction of a 20,000 SF two story school building to
an existing building and complete gut and reconstruction of
the existing 64,000 SF two story building. Cuts & fills
of excavation, storm system, sewer system, paving, curbs,
sidewalks, fencing, seeding, playground surfacing, concrete
footings, slab on grade, slab on deck, brick, masonry, structural
steel, stairs, and railings, EIFS, SBS roofing, spray-on fireproofing,
doors, frames, hardware, windows, storefronts, curtain walls,
structural studs, light gage studs, drywall, ceramic tile,
acoustical ceilings, painting, paneling, toilet room partitions,
operable partitions, toilet room accessories, food service
equipment, pre-fabricated, casework, sprinkler system, plumbing
system, radon system, HVAC, and electrical system.
Location: Millville, New Jersey
Owner: New Jersey Schools Construction Corporation
Architect: Becica Associates
Project Architect: Angelia Gambale
Construction Management Firm: Gilbane Construction Company
Managers: Matt Venanzi, Harry Collins
Completion Date: 02/05
|